Exxon Mobil’s Papua New Guinea LNG project from Kopi in the
Front End Engineering Design for EPC5 Bridges.
1. 5 mainly large River Crossings from Kopi in the
2. 3 bridges from Idauwi to the Hides Gas
Conditioning Plant in the
3. Preliminary design of 9 large bridges from Mendi
Turnoff to
4. Preliminary documentation for 9 replacement bridges from Mendi Turnoff - Poroma – Nipa – Margarima – Tari – Idauwi (The Ring Road) and 4 Major Bridges on the Highlands Highway.
5. Structural designs for tender of the
6. Inspection and reporting on 26 bridges in The Southern Highlands, The Western Highlands and Eastern Highlands of Papua New Guinea.
Below: Proposed The new Bridge
is located on the proposed alternative Komo
Airfield – Source: EOS
joint venture Below: Existing Timalia
Bridge. The Bridge is located on the old Komo Airfield – HGCP road. Source: EOS
joint venture
Front End Engineering Design. (FEED)
2008 – 2009. Below: Arua Bridge southern
Highlands PNG prior to upgrading. The bridge is viewed from the deck and
below from the river and from the air.
Source: EOS joint venture